Icon
Name
Title
Date
 
thumb
2012.55.0378 (80-290)Laying the first section of the mosaic floor at the north end. Note the sequence above the main slab: a thin layer of sand, tar paper underbed with wire-mesh, metal strips bed for marble chips.4 Jul 1956 
thumb
1997.07.0456 (80-291)Placing bed for the marble chips. Laying the first section of the mosaic floor at the north end. Note the sequence above the main slab: a thin layer of sand, tar paper underbed with wire-mesh, metal strips bed for marble chips.4 Jul 1956 
thumb
2012.55.0379 (80-291)Placing bed for the marble chips. Laying the first section of the mosaic floor at the north end. Note the sequence above the main slab: a thin layer of sand, tar paper underbed with wire-mesh, metal strips bed for marble chips.4 Jul 1956 
thumb
1997.07.0457 (80-292)Mixing the marble chips for the floor.4 Jul 1956 
thumb
2012.55.0380 (80-292)Mixing the marble chips for the floor.4 Jul 1956 
thumb
1997.07.0458 (80-293)Sprinkling the marble chips for the floor.4 Jul 1956 
thumb
2012.55.0381 (80-293)Sprinkling the marble chips for the floor.4 Jul 1956 
thumb
1997.07.0459 (80-294)Rolling the marble chips in dry state.4 Jul 1956