Icon, Name, Title, Date, Chronology
|
| 2021.17.0095 | New layer between walls, rubble continues to east. | 15 Jul 2021 | | | | 2021.17.0096 | New layer between walls. | 15 Jul 2021 | | | | 2021.17.0097 | After uncovering new layer between walls, before excavating fills over walls. | 15 Jul 2021 | | | | 2021.17.0098 | Before excavating fill over south wall. | 15 Jul 2021 | | | | 2021.17.0099 | Before excavating fill over south wall. | 15 Jul 2021 | | | | 2021.17.0109 | Traces of W-E line of plaster in fill parallel to exposed block of Wall 33. | 16 Jul 2021 | | | | 2021.17.0110 | Traces of W-E line of plaster in fill parallel to exposed block of Wall 33. | 16 Jul 2021 | | | | 2021.17.0111 | Traces of W-E line of plaster in fill parallel to exposed block of Wall 33. | 16 Jul 2021 | | |
|