Icon
Name
Title
Date
Chronology
 
thumb
2021.17.0095New layer between walls, rubble continues to east.15 Jul 2021  
thumb
2021.17.0096New layer between walls.15 Jul 2021  
thumb
2021.17.0097After uncovering new layer between walls, before excavating fills over walls.15 Jul 2021  
thumb
2021.17.0098Before excavating fill over south wall.15 Jul 2021  
thumb
2021.17.0099Before excavating fill over south wall.15 Jul 2021  
thumb
2021.17.0109Traces of W-E line of plaster in fill parallel to exposed block of Wall 33.16 Jul 2021  
thumb
2021.17.0110Traces of W-E line of plaster in fill parallel to exposed block of Wall 33.16 Jul 2021  
thumb
2021.17.0111Traces of W-E line of plaster in fill parallel to exposed block of Wall 33.16 Jul 2021