Plans and Drawings (11,513)
|
| DA 12352 | Detail of Map 1, showing the four bridges that were built over the railway line after 1890 | 2020 | | | | DA 12353 | Λεπτομέρια του Χάρτη 1 με τις τέσσερις γέφυρες ποθ χτίστηκαν πάνω από τις γραμμές του συρμού μετά το 1890 | | | | | DA 12393 | Preliminary Study of Late-Roman Buildings.
Part of Sections ΒΕ and ΒΖ at End of 2003 Excavation Season. | July 2003 | | | | DA 12394 | Preliminary Study of 2004 Excavation Findings
Part of Sections ΒΕ and ΒΖ at End of 2004 Excavation Season. | August 2004 | | | | DA 12396 | Northern Part of Section ΒΗ at End of 2006 Season. | 10 Aug 2006 | | | | DA 12400 | Section ΒΖ South, 2006 Season. | May 2006 | | | | DA 12402 | Section ΒΖ South (West of Street). Provisional plan after Excavation 2006. | 10 Aug 2006 | | | | DA 12403 | Section Γ, "Strategeion" Area. Plan at End of 2006 Season. | 10 Aug 2006 | | |
|