| View to show the first section of the finished ceiling on the second storey ... northeast 5010 ... 22 Jun 1956 |
| Assembly of the upper front order. View from the inside ... 13 Feb 1956 |
| View with the ceiling finished, floor being ground ... southwest 5044 ... 7 Aug 1956 |
| View of the north end showing the first Pergamene column in place with mock-up of anta at corner ... east ... 12 Dec 1955 |
| Suggested restoration of the south end, with the fountain and the entrance stairway ... John Travlos ... 855 ... 1954 |
| General view of the terrace ... southeast 5036 Horizontal (normal) ... 26 Jul 1956 |
| Laying terrace floor, detail. Above the main concrete slab was laid a mass of pumic concrete (ca. 0.20 m.) to raise the level without unduly increasing the weight; over this cover was poured a layer of ... northwest 5034 Horizontal (normal) ... 26 Jul 1956 |
| Erection of the ceiling ... southeast 4932 ... 18 April 1956 |
|
|