Laying terrace floor, detail. Above the main concrete slab was laid a mass of pumic concrete (ca. 0.20 m.) to raise the level without unduly increasing the weight; over this cover was poured a layer of regular concrete with reinforcing, then this was surfaced with brown poros chips left rough.