Name, Title, Date, Chronology
|
2015.21.0003 | Actual state plan of the Metroon-Bouleuterion complex. | 1936 | | | PD 2549 (DA 13505) | Restoration of the New Bouleuterion showing relationship to existing foundation. | 2009
1983 | | | 1997.03.0393 (7-24) | Cross sections through the Metroon-Bouleuterion Complex. | 1936 | | | 1997.03.0395 (88-365) | New Bouleuterion. Alternate scheme for curved seating, facing south, ca. 415-406 B.C. Restored plan superimposed over actual remains. | 1983-1984 | | | 1997.04.0165 (7-26) | Actual state plan of the Metroon-Bouleuterion complex. | 1936 | | | 1997.04.0166 (7-27) | Restored plan of the Metroon-Bouleuterion complex. | 1936 | | | 2012.59.0306 (88-365) | New Bouleuterion. Alternate scheme for curved seating, facing south, ca. 415-406 B.C. Restored plan superimposed over actual remains. | 1983-1984 | | | 2012.23.0152 (4-384) | Actual state plan of the Metroon-Bouleuterion Complex. | 1934 | | |
|