Icon, Name, Title, Chronology
2023.14.0018 Backfilling of Sectio n ΒΘ, day 2. Craig Mauzy sitting on a building block soon to be covered with geotextile. 2023.14.0019 Backfilling of Section ΒΘ, day 2. Building block to be covered by geotextile. 2023.14.0020 Backfilling of Section ΒΘ, day 2. The earth ramp over Section ΒΘ to Section BK. Part of Section ΒΘ covered in geotextile. 2023.14.0021 Backfilling of Section ΒΘ, day 2. Building a retaining wall with sandbags. 2023.14.0022 Backfilling of Section ΒΘ, day 2. General view of the excavation area with Section ΒΘ covered with geotextile. At center, the retaining wall made of sandbags. 2023.14.0023 Backfilling of Section ΒΘ, day 2. Cat having fun on the geotextile. 2023.14.0024 Backfilling of Section ΒΘ, day 2. Cat having fun on the geotextile. 2023.14.0025 Backfilling of Section ΒΘ, day 2. Cat in the excavation area.