2023.14.0018Backfilling of Sectio n ΒΘ, day 2. Craig Mauzy sitting on a building block soon to be covered with geotextile.9 May 2023  
thumb
2023.14.0019Backfilling of Section ΒΘ, day 2. Building block to be covered by geotextile.9 May 2023  
thumb
2023.14.0020Backfilling of Section ΒΘ, day 2. The earth ramp over Section ΒΘ to Section BK. Part of Section ΒΘ covered in geotextile.9 May 2023  
thumb
2023.14.0021Backfilling of Section ΒΘ, day 2. Building a retaining wall with sandbags.9 May 2023  
thumb
2023.14.0022Backfilling of Section ΒΘ, day 2. General view of the excavation area with Section ΒΘ covered with geotextile. At center, the retaining wall made of sandbags.9 May 2023  
thumb
2023.14.0023Backfilling of Section ΒΘ, day 2. Cat having fun on the geotextile.9 May 2023  
thumb
2023.14.0024Backfilling of Section ΒΘ, day 2. Cat having fun on the geotextile.9 May 2023  
thumb
2023.14.0025Backfilling of Section ΒΘ, day 2. Cat in the excavation area.9 May 2023