Icon, Name, Title, Date, Chronology
2023.14.0018 Backfilling of Sectio n ΒΘ, day 2. Craig Mauzy sitting on a building block soon to be covered with geotextile. 9 May 2023 2023.14.0019 Backfilling of Section ΒΘ, day 2. Building block to be covered by geotextile. 9 May 2023 2023.14.0020 Backfilling of Section ΒΘ, day 2. The earth ramp over Section ΒΘ to Section BK. Part of Section ΒΘ covered in geotextile. 9 May 2023 2023.14.0021 Backfilling of Section ΒΘ, day 2. Building a retaining wall with sandbags. 9 May 2023 2023.14.0022 Backfilling of Section ΒΘ, day 2. General view of the excavation area with Section ΒΘ covered with geotextile. At center, the retaining wall made of sandbags. 9 May 2023 2023.14.0023 Backfilling of Section ΒΘ, day 2. Cat having fun on the geotextile. 9 May 2023 2023.14.0024 Backfilling of Section ΒΘ, day 2. Cat having fun on the geotextile. 9 May 2023 2023.14.0025 Backfilling of Section ΒΘ, day 2. Cat in the excavation area. 9 May 2023