icon

[Agora Image] 2001.01.0030

Pithos in Room E after removal of the northern packing fill and before removal of the pithos. [After basket 6; Before basket 9] ... Marcie Handler ... north ... 14 Jun 2001

icon

[Agora Image] 2001.01.0031

West side of the Drain on the North-South Road after removing a layer of road metal. The depression in the center was left by the removal of one of the three large stones. [After basket 8; Before basket ... Marcie Handler ... west ... 14 Jun 2001

icon

[Agora Image] 2001.01.0032

West side of the Drain on the North-South Road showing two layers of road metal: upper level (top), lower level (bottom). [After basket 8; Before basket 11] ... Marcie Handler ... north ... 14 Jun 2001

icon

[Agora Image] 2001.01.0033

West side of the Drain on the North-South Road showing two layers of road metal: upper level (bottom), lower level (top). [After basket 8; Before basket 11] ... Marcie Handler ... south ... 14 Jun 2001

icon

[Agora Image] 2001.01.0039

Road surface on the west side of the Drain contemporary with the paving stones (right). [After basket 8; Before basket 11] ... Marcie Handler ... north ... 15 Jun 2001

icon

[Agora Image] 2001.01.0040

Road surface on the northwest section of the Drain contemporary with the paving stones (top right). [After basket 8; Before basket 11] ... Marcie Handler ... east ... 15 Jun 2001

icon

[Agora Image] 2001.01.0041

Southern section of the road surface on the west side of the Drain contemporary with the paving stones (center top). [After basket 8; Before basket 11] ... Marcie Handler ... southeast ... 15 Jun 2001

icon

[Agora Image] 2001.01.0042

Road surface on the west side of the Drain after removing a higher surface. [After basket 11; Before basket 12] ... Marcie Handler ... west ... 15 Jun 2001